The steel platform solution we offered for EcoGreen is a reflection of our engineering and innovation power. This giant structure, 40 meters long and weighing 700 tons, stands out with its high carrying capacity and durability, while 66,000 bolts used in its assembly have brought durability and safety to the highest level.
We are proud to offer the most suitable solution for EcoGreen’s needs by using our perfectionist approach and advanced technologies in the production process.
Project Details:
Length: 40 meters
Tonnage: 700 Tons
Bolts Used: 66,000