PROJECTS

Ecogreen

Project Gallery

About Project

The steel platform solution we offered for EcoGreen is a reflection of our engineering and innovation power. This giant structure, 40 meters long and weighing 700 tons, stands out with its high carrying capacity and durability, while 66,000 bolts used in its assembly have brought durability and safety to the highest level.

We are proud to offer the most suitable solution for EcoGreen’s needs by using our perfectionist approach and advanced technologies in the production process.

Project Details:
Length:
40 meters
Tonnage:
700 Tons
Bolts Used:
66,000

Other Projects

Write us

Write to us for detailed information about our services and projects or for any questions you may have. Our consultants will get back to you as soon as possible.

Get a Quick Quote

In every project, we prioritize providing the most appropriate and innovative solutions to our customers’ needs. Share your requests with us, our expert team will get back to you as soon as possible.

Offer Form